top of page

FORT KENT

INTERNATIONAL PORT OF ENTRY

A complex project that involved multiple trades, a short timeline, and a postage stamp size lot. The scope of work consisted of constructing a new drive through canopy for the new international bridge connecting Fort Kent, ME to Clair, NB in 30 days while keeping the existing inspection booths open for traffic entering the US on the old bridge.  Powers' part of the project consisted of the mod bit roof, metal siding, concrete siding, linear metal soffit, and signage. 

bottom of page